New owners, New Fresh Look
Description

A full refresh for an old café. The existing counter was removed to make way for a new bar and servery. Walls were repainted, timber floors stripped back and re-stained and the building was virtually rewired.

Client

Upland Café

Start Date

July 2014

Procurement

Negotiated

Added Value

SUMMIT and our Joinery subcontractor worked with the client to ensure they received exactly what they wanted within their budget. After removing the old counter we discovered the floor was rotten and our site team worked to salvage timber from covered areas to use in the open area ensuring the sanded floor remained consistent