SUMMIT Construction | 711 Victoria Street - SUMMIT Construction
15670
single,single-portfolio_page,postid-15670,ajax_fade,page_not_loaded,,wpb-js-composer js-comp-ver-4.11.2,vc_responsive

711 Victoria Street

Seismic Upgrade, Stair Strengthening
Description

Strengthening two stairwells in a nine-story building. The scope of work required a new steel bracket to be installed under each landing prior to removing a 100mm section of concrete and covering with a steel plate – allowing the stairs to slide and not compact in the event of a shake. The works were carried out in the evenings and weekends to ensure the buildings occupants did not suffer undue disruption.

Client

Prime Properties

Start Date

March 2014

Procurement

Tender, Undisclosed

Added Value

The SUMMIT team worked with the Landlord to ensure the tenants requirements were met. This meant working odd hours and a stringent clean regime at the end of each shift.